Practice area · Kansas City and remote

Energy & Grid Economics

AI's growth runs through the power grid. Large data-center loads change who pays for new transmission and generation, and tariff terms such as minimum bills, contract length and collateral decide whether other customers are protected if a project leaves. Vector 1 models those economics for utilities, large-load customers, policymakers and engineering firms.

What we do

  • Large-load tariff analysis: minimum bills, terms, collateral and stranded-cost risk
  • Flexible load and distributed compute as grid resources
  • Bill-impact modeling for residential and commercial customers
  • LNG, natural gas and fuel-cost economics

Talk about your project

Tell us what you're trying to measure, forecast or decide. We work with teams in Kansas City and remotely, and we reply within two business days.

Email [email protected]

Try it: interactive demos

Common questions

What is a large-load tariff?

A large-load tariff is a utility rate schedule for very large new customers, such as data centers. It usually sets minimum bills, long contract terms, collateral and exit fees, so that the cost of grid investment built for the customer isn't shifted to other ratepayers if the customer uses less power than planned or leaves early.

Who pays if a data center leaves early?

That depends on the tariff. Without enough minimum-bill commitment, contract length, collateral or exit fees, the unrecovered cost of grid investment built to serve the data center can fall on the utility's other customers.

Do you work with teams outside Kansas City?

Yes. Vector 1 is based in Kansas City and works with teams in the metro and remotely.